2016 CFSEI DESIGN EXCELLENCE AWARD WINNERS
FIRST PLACE
BASE DESIGN GROUP, INC. – MEDITECH FOXBOROUGH OFFICE AND CONFERENCE CENTER FOXBOROUGH, MA
Meditech Foxborough Office and Conference Center 1 Constitution Way Foxborough, MA 02035
Completed: June 2015 Construction Cost: $35 million
Owner: MEDITECH Architect of Record: Payette Associates Inc. Engineer of Record for Structural Work: Goldstein-Milano LLC Cold-Formed Steel Specialty Engineer: Base Design Group, Inc. Cold-Formed Steel Specialty Contractor: Commercial Drywall & Construction Co. Inc. Award Entry Submitted by: Nate Bacon, P.E., Base Design Group, Inc.
Project Summary Details
SECOND PLACE
EXCEL ENGINEERING, INC. – THE WHARF WASHINGTON, DC
The Wharf – 525 Water 525 Water Street, SW Washington, DC 20024
Completed: December 2015 Construction Cost: $30 million
Owner: RWP, LLC Architect of Record: SK&I Architectural Design Group, LLC Engineer of Record for Structural Work: Brian McSweeney, Ehlert Bryan Cold-Formed Steel Specialty Engineer: Joe Wilkum, Excel Engineering, Inc. Cold-Formed Steel Specialty Contractor: Trevor Wyman, FrameCo, Inc. Award Entry Submitted by: Bill Wilde, Excel Engineering, Inc.
Project Summary Details
THIRD PLACE
CLARKDIETRICH ENGINEERING SERVICES, LLC – WILLIAM P. HOBBY AIRPORT EXPANSION PROJECT HOUSTON, TX
William P. Hobby Airport 7748 Airport Blvd. Houston, TX 77061
Completed: October 2015 Construction Cost: $156 million
Owner: Southwest Airlines Architect of Record: Corgan Associates, Inc. Engineer of Record for Structural Work: Raxit Patel, Henderson & Rogers, Inc./ Rogers Moore Engineers, Inc. Cold-Formed Steel Specialty Engineer: Wesley Burghardt/Bill Ewing/Brent Owens/Kale McDaniel, ClarkDietrich Engineering Services, LLC Cold-Formed Steel Specialty Contractor: Texas Exterior Systems Award Entry Submitted by:Wesley Burghardt, ClarkDietrich Engineering Services, LLC
Project Summary Details
|