| 2017 CFSEI DESIGN EXCELLENCE AWARD WINNERSFIRST PLACE/RESIDENTIAL EXCEL ENGINEERING,  INC. – COLLEGETOWN TERRACE BUILDING 7, ITHACA, NY
 Collegetown Terrace Building 7120 Valentine Place
 Ithaca, NY 14850
 
Completed: April 2017Construction Cost: $40 million
 Owner: Novarr Mackesey DevelopmentArchitect of Record: Ikon.5 Architects
 Engineer of Record for Structural Work: Robert Sillman Associates
 Cold-Formed Steel Specialty Engineer: Greg Wilkum, Excel Engineering, Inc.
 Cold-Formed Steel Specialty Contractor: Norm Aidun, John C. Lowery, Inc.
 Award Entry Submitted by: Greg Wilkum, Excel Engineering, Inc.
 Project Summary Details FIRST PLACE/MUNICIPAL (Tied)
 MATSEN FORD DESIGN ASSOCIATES, INC.  – THE CADE MUSEUM FOR CREATIVITY AND INVENTION, GAINESVILLE, FL
 The Cade Museum for Creativity and Invention801 South Main Street
 Gainesville, FL 32601
 
Completed: Summer 2017Construction Cost: $9.2 million
 Owner: Phoebe Cade-MilesArchitect of Record: GWWO Inc. / Architects
 Engineer of Record for Structural Work: Thornton Tomasetti
 Cold-Formed Steel Specialty Engineer: Matsen Ford Design Associates, Inc.
 Cold-Formed Steel Specialty Contractor: Central Florida Drywall and Plastering, Inc.
 Award Entry Submitted by: Susan M. Dzibinski,  Matsen Ford Design Associates, Inc.
 Project Summary Details FIRST PLACE/MUNICIPAL (Tied)
 RADIUS TRACK CORPORATION AND MCCLURE ENGINEERING COMPANY - FAENA FORUM, MIAMI, FL
  Faena Forum3300-3398 Collins Avenue
 Miami,  FL 33140
  Completed: November 2016 Owner: Faena Owner's Representative: Gardner and Theobald Inc.
 Architect: OMA*AMO Architecture
 Architect of Record: Revuelta Architecture International
 Engineer of Record for Structural Work: Desimone Consulting Engineers
 General Contractor: Layton Construction
 Dome Cold-Formed Steel Specialty Engineer: McClure Engineering Company
 Dome Cold-Formed Steel Specialty Contractor: Titus Construction Group
 Award Entry Submitted by: Kris Willardson, Radius Track Corporation and Cody L. Dailey, P.E., S.E., McClure Engineering Company
 Project Summary Details FIRST PLACE/COMMERCIALSHAFFER WILSON SARVER & GRAY, PC - MGM NATIONAL HARBOR, OXON HILL, MD  MGM National Harbor 101 MGM National Avenue
 Oxon Hill, MD 20745
 
Completed: December 8, 2016Construction Cost: $1.4 billion
 Owner: MGM Resorts International Project Summary DetailsArchitect of Record: Smithgroup JJR
 Engineer of Record for Structural Work: Cagley & Associates
 Cold-Formed Steel Specialty Engineer: Shaffer Wilson Sarver & Gray, PC (SWSG, PC)
 Cold-Formed Steel Specialty Contractor: Rick Nicolari, Project Manager - Component Assembly Systems, Inc.
 Award Entry Submitted by: Theodore R. Welti, P.E., Division Manager - SWSG, PC and Akhil Jain, Structural Engineer - SWSG, PC
 |