2024 CFSEI DESIGN EXCELLENCE AWARD WINNERS
FIRST PLACE
LOCHSA ENGINEERING, LLC THE (W)RAPPER LOS ANGELES, CALIFORNIA
The (W)rapper 5790 West Jefferson Blvd. Los Angeles, CA 90016
Completion Date: January 2023
Owner: Samitaur Constructs. Architect of Record: Eric Owen Moss, Eric Owen Moss Architects. Engineer of Record for Structural Work: Atka Zekioglu, ARUP. Cold-Formed Steel Specialty Engineer: Derrick Suarez, P.E., Lochsa Engineering, LLC. Cold-Formed Steel Specialty Contractor: Trevor Lykins, Performance Contracting, Inc. Award Entry Submitted by: Nick Hrico, P.E., Lochsa Engineering, LLC.
Project Summary Details
SECOND PLACE
ENSIGN ENGINEERING AND LAND SURVEYING THE SPHERE AT THE VENETIAN RESORT LAS VEGAS, NEVADA
The Sphere at the Venetian Resort 255 Sands Avenue Las Vegas, NV 89169
Completion Date: September 2023 Construction Cost: 2.3 Billion
Owner: The Madison Square Garden Company. Architect of Record: Populous. Engineer of Record for Structural Work: Severud Associates Consulting Engineers. Cold-Formed Steel Specialty Engineer: Alex Hawkins, P.E., S.E., Ensign Engineering and Landing Surveying. Cold-Formed Steel Specialty Contractor: Carissa Wood, KHS&S Contractors. Award Entry Submitted by: Scott Roche, Ensign Engineering and Landing Surveying.
Project Summary Details
THIRD PLACE
CLARKDIETRICH ENGINEERING DESIGN – IQHQ RESEARCH AND DEVELOPMENT DISTRICT– BLOCK 2A SAN DIEGO, CALIFORNIA
IQHQ Research and Development District – Block 2A 525 N Harbor Drive San Diego, CA 92132
Completion Date: October 2023 (Framing Complete) Construction Cost: $50 Million
Owner: IQHQ Architect of Record: Erin Lilly, Gensler. Engineer of Record for Structural Work: Eric Lehmkuhl, KPFF. Cold-Formed Steel Specialty Engineer: Jennifer Sexton, ClarkDietrich Engineering Design; Brett Olson, P.E., ClarkDietrich Engineering Design; Tammy Gleed, P.E., ClarkDietrich Engineering Design. Cold-Formed Steel Specialty Contractor: Tim Almond, Brady West. Award Entry Submitted by: Jennifer Sexton, ClarkDietrich Engineering Design.
Project Summary Details
2024 CFSEI CREATIVE DETAIL WINNERS
FIRST PLACE
ENSIGN ENGINEERING AND LAND SURVEYING UNIVERSAL STUDIOS HOLLYWOOD – MARIO KART RIDE UNIVERSAL CITY, CALIFORNIA
Universal Studios Hollywood – Mario Kart Ride 100 Universal City Plaza Universal City, CA 91608
Completion Date: January 2023
Owner: Universal Studios. Architect of Record: Rajan Prakash Pradhan, Universal Creative. Engineer of Record for Structural Work: Annie Fan, MSSE, P.E., AECOM. Cold-Formed Steel Specialty Engineer: Tye M. Carlile, P.E., Ensign Engineering and Land Surveying. Cold-Formed Steel Specialty Contractor: Shane Hastain, P.E., KHS&S. Award Entry Submitted by: Scott B. Roche, P.E., S.E., Ensign Engineering and Land Surveying.
Project Summary Details
SECOND PLACE
EXCEL ENGINEERING, INC. DNS CAPITAL CHICAGO, ILLINOIS
DNS Capital 410 North Michigan Avenue, Suite 17 Chicago, IL 60611
Completion Date: 2016
Owner: DNS Capital. Architect of Record: Dirk Denison Architects. Engineer of Record for Structural Work: TGRWA, LLC. Cold-Formed Steel Specialty Engineer: Joe Wilkum, Excel Engineering, Inc. Cold-Formed Steel Specialty Contractor: Nick Erickson, E&K of Chicago. Award Entry Submitted by: Joe Wilkum, Excel Engineering, Inc.
Project Summary Details
THIRD PLACE
DIGITAL BUILDING COMPONENTS LLC MERIDIAN MEDICAL OFFICE BUILDING SANTA FE, NEW MEXICO
Meridian Medical Office Building 4200 Beckner Road Santa Fe, New Mexico 87507
Completion Date: 2023 Construction Cost: $100 Million
Owner: Santa Fe Las Soleras Medical Development LLC. Architect of Record: Lisa Kincaid, Page Southerland Page, Inc. Engineer of Record for Structural Work: Steven C. Ball, P.E., S.E., AG&E. Cold-Formed Steel Specialty Engineer: Nick Yuen, P.E., Buehler Engineering Inc. Cold-Formed Steel Specialty Contractor: Travis McCoy, P.E., S.E., Digital Building Components LLC; Venkata Charan, P.E., Digital Building Components LLC. Award Entry Submitted by: Venkata Charan, P.E., Digital Building Components LLC.
Project Summary Details
2024 CFSEI DESIGN EXCELLENCE AWARD WINNERS
HONORABLE MENTION
MCCLURE ANGELO CAPUTO’S – NORRIDGE NORRIDGE, ILLINOIS
Angelo Caputo’s – Norridge 4410 North Harlem Avenue Norridge, IL 60706
Completion Date: 2023
Owner: Caputo’s Architect of Record: Camburas and Theodore Architects. Engineer of Record for Structural Work: Camburas and Theodore Architects. Cold-Formed Steel Specialty Engineer: Josh Garton, P.E., McClure. Cold-Formed Steel Specialty Contractor: Austin McInerny, Radius Track Corporation; Sara Gutowski, Radius Track Corporation; Carl Wedell, Radius Track Corporation. Installing Contractor: Bill Becker, TIDAL Construction Services, Inc. General Contractor: John Divita, J. Divita & Associates-Lake Zurich. Award Entry Submitted by: Lauren Gutknecht, McClure.
Project Summary Details
HONORABLE MENTION
SALAS O’BRIEN DENVER INTERNATIONAL AIRPORT CONCOURSE B EAST AND C EAST EXPANSIONS DENVER, COLORADO
Denver International Airport Concourse B East and C East Expansions 9100 Pena Blvd Denver, CO 80249
Completion Date: Fall 2022 Construction Cost: $3.8 Billion
Owner: City and County of Denver. Architect of Record: Andy Hoef, Jacobs. Engineer of Record for Structural Work: Lee Maggert, P.E., Jacobs. Cold-Formed Steel Specialty Engineer: Russ Leffler, Salas O’Brien. Cold-Formed Steel Specialty Contractor: Steve Chambers, Four Star Drywall. Award Entry Submitted by: Daniel Stadig, P.E., Salas O’Brien.
Project Summary Details
HONORABLE MENTION
EXCEL ENGINEERING, INC. FLEXJET RICHMOND HEIGHTS, OHIO
FlexJet 26000 Curtiss Wright Parkway Richmond Heights, OH 44143
Completion Date: Sept 2023 Construction Cost: $50 Million
Owner: Flexjet Architect of Record: Richard Hebard, Richard D. Hebard Architect Engineer of Record for Structural Work: Daniel J. Schenkel, Engineering Resources, Inc. Cold-Formed Steel Specialty Engineer: Erik Johnson, Excel Engineering, Inc. Cold-Formed Steel Specialty Contractor: Jason Dalessandro, JLJI Enterprises, Inc. Award Entry Submitted by: Erik Johnson, Excel Engineering, Inc.
Project Summary Details
HONORABLE MENTION
SALAS O’BRIEN COLORADO CONVENTION CENTER EXPANSION DENVER, COLORADO
Colorado Convention Center Expansion 700 14th Street Denver, CO 80202
Completion Date: December 2023 Construction Cost: $233 Million
Owner: City and County of Denver. Architect of Record: Justin Hughes, Thompson, Ventulett, Staiback & Associates, Inc. Engineer of Record for Structural Work: Kelly Knowles, Martin and Martin Engineering Consultants. Cold-Formed Steel Specialty Engineer: Russ Leffler, Salas O’Brien, Cold-Formed Steel Specialty Contractor: Steve Bradford, Select Prefab and Four Star Drywall. Award Entry Submitted by: Daniel Stadig, P.E., Salas O’Brien.
Project Summary Details
|